Product manufacturer

Saint Gobain

Product Category

Double Glazed Unit (DGU)

Saint Gobain Double Glazed Unit (DGU) ST 167 I Antelio Plus I Sparkling Ice I Saint gobain I DGU I Double Glaze Unit

DOUBLE GLAZED UNIT 6mm Coated Glass (coatingface 2) -12mm air gap - 6mm Clear Glass

Technical Specifications Summary

Glass Type
Architectural Glass
Glass Code
ST 167
Series
Antelio Plus
Colour
Neutral
Colour Shade
Sparkling Ice
Stock Sheet
3660X2440, 3210X2250, 3210X4500, 3210X 4880, 3210 X 5100, 3210X6100 mm
Inside Glass Thickness
6 mm
Air Gap
12 mm
Outside glass Thickness
6 mm
Coating
Metallic Coating
TR
60
ER
22
IR
23
SF
0.60
SC
0.68
UV
2.8

More Products fromSaint Gobain  logoSaint Gobain

Services & Tools

Comprehensive services and tools to support your Double Glazed Unit (DGU) project needs

Complete Technical Specifications for Saint Gobain ST 167 I Antelio Plus I Sparkling Ice I Saint gobain I DGU I Double Glaze Unit

PropertyValueUnit
Glass TypeArchitectural Glass
Glass CodeST 167
SeriesAntelio Plus
ColourNeutral
Colour ShadeSparkling Ice
Stock Sheet3660X2440, 3210X2250, 3210X4500, 3210X 4880, 3210 X 5100, 3210X6100mm
Inside Glass Thickness6mm
Air Gap12mm
Outside glass Thickness6mm
CoatingMetallic Coating
TR60
ER22
IR23
SF0.60
SC0.68
UV2.8

Product Documents & Downloads

No documents available for this product

Quality Assurance

We follow 4-point checks at our factory for quality assurance of Double Glazed Unit (DGU)

  • Raw materials check

    As soon as the raw materials come into production units, they undergo test at our labs to get their properties checked, passing which they go to the store.

  • Product Check

    The product thus manufactured, undergoes the most stringent test according to global standards, passing which it qualifies for dispatch.

  • Check at the manufacturing stage

    At different stages of manufacturing, tests are done to validate if the purpose of a particular stage has been served or not. For e.g at the pre-treatment stage it is checked whether degreasing or deoxidizing of the aluminium coil has properly taken place or not.

  • Post production check

    Before being dispatched, thorough visual inspection is done to check product tolerances and any other kind of manufacturing defect.