MODULAR FERI ARB-004 Glass Railing H Line
ARB-004 is a premium continuous aluminium profile system, similar to ARB-003 but with a heavier, wider modular base.
Product manufacturer
H LineProduct Category
Glass Railing
H Line Glass Railing MODULAR FERI ARB-004
ARB-004 is a premium continuous aluminium profile system, similar to ARB-003 but with a heavier, wider modular base.
Technical Specifications Summary
- Product Name
- MODULAR FERI ARB-004
- Material Grade
- Aluminium Alloy 6083-T6.
- Application
- Indoor & Outdoor.
- Dimensions
- — mm
- Glass Thickness
- 12 mm
- Mounting Type
- —
- Glass Height
- 24, 30, 36, 42 inch
- Surface Finish
- Natural, Anodize, Powder Coating, or Wooden Coating.
- Feature
- —
- Material Type
- —
- Length
- 13, 16 ft
- EPDM
- 0.150 gm
- Balcony Length
- 10, 20, 30 ft
More Products from
H Line
Services & Tools
Comprehensive services and tools to support your Glass Railing project needs
Complete Technical Specifications for H Line MODULAR FERI ARB-004
| Property | Value | Unit |
|---|---|---|
| Product Name | MODULAR FERI ARB-004 | — |
| Material Grade | Aluminium Alloy 6083-T6. | — |
| Application | Indoor & Outdoor. | — |
| Dimensions | — | mm |
| Glass Thickness | 12 | mm |
| Mounting Type | — | — |
| Glass Height | 24, 30, 36, 42 | inch |
| Surface Finish | Natural, Anodize, Powder Coating, or Wooden Coating. | — |
| Feature | — | — |
| Material Type | — | — |
| Length | 13, 16 | ft |
| EPDM | 0.150 | gm |
| Balcony Length | 10, 20, 30 | ft |
Product Documents & Downloads
No documents available for this product
Quality Assurance
We follow 4-point checks at our factory for quality assurance of Glass Railing
Raw materials check
As soon as the raw materials come into production units, they undergo test at our labs to get their properties checked, passing which they go to the store.
Product Check
The product thus manufactured, undergoes the most stringent test according to global standards, passing which it qualifies for dispatch.
Check at the manufacturing stage
At different stages of manufacturing, tests are done to validate if the purpose of a particular stage has been served or not. For e.g at the pre-treatment stage it is checked whether degreasing or deoxidizing of the aluminium coil has properly taken place or not.
Post production check
Before being dispatched, thorough visual inspection is done to check product tolerances and any other kind of manufacturing defect.










